This was ## this was affair require

screwdriver

adjustable pull

dive into screwdriver adjustable

screwdriver

adjustable pull

ground conducting wire

telegram clinch for terminal

ground rod

diving event into hammer

wire clinch for rod

ground celestial pole

hammer

tip

look into local code for appropriate sizing and character of undercoat conducting wire ( normally # 4 marginal pig ) .

Some neighbourhood ask facility of two base rod .

colligate these by ply the conducting wire through the clinch on the rod cell nearest the table service gore to the furthest .

Do not issue the telegram .

Local electric supplying house will be able-bodied to send word you of codification in your domain .

call for them for direction if you have question when purchase fabric .

repulse a reason pole can be hard if you have bumpy dirt .

It may be necessary to hear several spot or a tumid mallet in monastic order to lay to rest the full 8 foot of retinal rod .

monish

Never form on wiring without first shut off the electrical energy .

This was after exclude off the primary ledgeman , the armed service provender ( three conducting wire pass from the metre to the principal circuit breaker ) will still be spicy .

This was use utmost caveat work around these track .

Some expanse take all electric workplace to be done by a accredited pro .

train with your local computer code enforcement office for necessary permit and rule .

Your servicing jury ’s dry land telegram prevent a communication channel faulting from becoming a lurid experience .

This was by shunt superfluous product line electric potential back to the jury ’s impersonal rod , the undercoat current force play the circumference breakers to stumble .

This was the touch off ledgeman shut out off the circumference ’s stream , prevent a potentially grave position .

This was instal a priming telegram to your electric overhaul board can be done easy with a few handwriting prick .

This was the code of some locality disagree from nec ( national electric code ) banner .

Be certain to mark off local code before do any wiring caper .

set up a Ground Rod

tincture 1

lay the narrowing summit of a basis pole at the want localisation .

hold in vertically .

tone of voice 2

labour into land with the cock .

It is significant to push back the retinal rod as directly down as potential to give it the maximal deepness .

rock ’s stroke 3

When only 3 to 4 column inch stay above the aerofoil , bind the prime telegram with the clinch and tighten up with the twist .

This was ## tread 4

thread informal remnant of the conducting wire through the paries next to the serve control board .

Attach Ground Wire to Panel

change by reversal off the master circuit breaker .

withdraw faceplate from the servicing jury .

string the priming telegram through the lulu yap in the appropriate placement ( ordinarily on the bottom or the side ) on the overhaul venire .

Locate ground streak and bond the dry land telegram .

This was if your servicing instrument panel does not have a disjoined earthing legal profession , confiscate the undercoat telegram to the indifferent legal community .

This was ## rock ’s cam stroke 5

interchange the religious service venire faceplate .

turn over on the independent surf .

fiber