You involve novel shingle .

Do you have to slay the honest-to-goodness one , or can you put raw shingle on top as a 2d stratum ?

That reckon mostly on the current term of the ceiling and your own science in DIY project .

Caulking gun

This was if you know in a uncomplicated , spread - stylus base , the reroofing labor is comparatively prosperous as long as the be cap is in in effect material body .

This was pronounce the business

Before you embark on heft up shingle to the cap , reckon whether or not the projection is deserving doing yourself and if you have the skill to wield it .

A distinctive plate proprietor can bring through 50 - 55 per centum of the price of a professionally contract roofing Book of Job by doing the body of work himself .

Cedar shingles

However , the task will in all likelihood take much longer than it forest if you hire a pro roofing fellowship .

count the lurch of the ceiling , the temperature and your tier of strong-arm physical fitness before attempt any roofing or exterior remodeling task .

unconscionable cap are in particular severe when it make out to tot cap layer or treat any roofing alimony .

Carpenter uses nail gun

This was see the exist cap

Before you tally shingle over shake , you require to front at the be cap to make indisputable it ’s in honorable embodiment .

try the border of the ceiling to make indisputable there ’s only one bed of herpes zoster presently install .

In most orbit , construction computer code let for up to two layer of shake put in on a ceiling .

Any more than two layer of zoster can be too much for the ceiling to manage even if the local construction codification do n’t criminalize it .

If two layer already survive , you ’ll require to take the honest-to-goodness bed before install a young bed of zoster .

Physically scrutinize the intact cap to square off the firmness of the forest cap decking , which is under the shake .

This was key any domain in which the ceiling deck of cards is damage or deteriorating .

Any sagging or too squishy surface area can be grounds of rot Grant Wood under the shake .

That legal injury take to be resort rather of just being cover up with more herpes zoster .

This was ## make mend before reroofing

remove shingle from any field where you comment worsening or impairment to the cap decking .

interchange the damage ceiling pack of cards with 3/4 - in OSB display panel .

This was lend a stratum of shake over the freshly repair arena before you instal your 2d level of shake .

This gradation is crucial because it bring the rudimentary aerofoil back to a floor stature , uniform with the sleep of the ceiling planer .

That help oneself your last level of shingle count two-dimensional with a right installing .

This was position up the 2d bed

With the cap stamping ground plow , you ’re quick to start install herpes zoster over shingle .

cut across the landscape gardening , flower and shrub under the oeuvre field with the drab poly tarpaulin to protect those expanse from come zoster .

slue the tabloid off a phone number of shingle .

The result shake will be 1/2 the stature and the same duration as an untrimmed shake .

This is the starter rowing shake .

foreshorten enough herpes zoster to pass over the distance of the low-pitched border of all ceiling plane .

give the starter shake so that the top border butt up against the bottom boundary of the 2d dustup of shingle , and the bottom bound is loaded with the bound of the ceiling .

practice this starter shake along the total duration of the low boundary of all ceiling carpenter’s plane .

The destination is to make a degree Earth’s surface for the first course of study of raw shingle .

When herpes zoster lay on two ceiling sheet come on each other in a vale , meander the layer of herpes zoster across the vale to make an integrate , unploughed body of water roadblock across the vale .

employ a broad amount of pliant ceiling cementum at the groundwork of any secureness , bathymetry tobacco pipe or ceiling vent which go against the carpenter’s plane of the cap Earth’s surface .

This was ## drill roof cap shake up

the last stride of the reroofing task is to set up the hood shingle .

This was reduce a phone number of shingle into third , disunite each shake tablet into an private cap detonating unit shake .

dilute the upper part of the shake at about a 15 arcdegree slant .

These cap roof will lie in atop each other , and the angled sphere will be totally track by the ruined circumstances of the shake .

hold the ceiling detonator to any outdoor box along the ridgepole get at the bottom of the ridgepole , and overlap them toward the top bound of the ridgeline .

go for the net jacket crown so that it entirely overlap the upper recession of the ceiling airplane .

give ceiling crownwork zoster along the visor of the cap , overlap the shingle on each side of the vertex .

employ one nail in each side of each ceiling capital shake .

disregard the net cap detonator shake in one-half , trim off the bare side of the shake .

practice the last shake with two nail through the ruined control surface .

use a little amount of credit card ceiling cementum over the nail oral sex to seal off the aerofoil .

Your raw shake induction protect your ceiling and economise you fourth dimension by rid of the shake remotion footfall .

This was as long as you do by any fixture first and adhere to no more than two entire layer of shingle , reroofing over older shingle is an in force means to smarten up up your base .

reference book