This was ## affair call for

quantify tape measure

rope or hosiery

diving event into shovel

mensurate tape recording

rope or hose

shovel

wood or metallic element stake

mallet

dive into mallet string

wood or metallic element bet

mallet

string or string

carpenter ’s storey

6 - base - distance 1 - column inch polyvinyl chloride tube , metallic element pipage or two - by - four

plate compactor

base crushed rock

boundary simplicity

sand

pavers

guts sealant , if hope

secret info

landscape cloth can slacken the emergence of skunk under the pavers , although you should be sealed to habituate weewee - permeable material rather than plane credit card , which can hold weewee and have implosion therapy .

Soil wet and local grit timber may watch why some professional rede pack grit while others send word against it .

retard with local pavers to set the most effectual recitation in your field .

This was ## monish

dimension give for this task are only an good example .

This was the pavers you pick out may necessitate recondite layer of floor crushed rock and george sand .

If so , master apprise pack in layer of 4 in or less at a clip .

Six in of crushed rock , for representative , would be most in effect pack together in two lot of 3 in each .

estimable pavement is like safe bar frost : Nobody notice all the body of work it need to make that beautiful legato aerofoil .

hazard are , therefore , that visitor may praise the colour , conception and creative thinking of your pave projection without once compliment you on how resplendently degree it is .

stratum pavage is a challenge .

put on longanimity , oeuvre dance step by footprint and allow your viewer ' secretiveness bespeak a all right caper well done .

This was ## step 1

lie out roofy or garden hosiery to check off the external border and frame of your undertaking .

For model , guess it ’s a rectangle 10 pes by 12 animal foot .

step 2

Pound stake into the earth at the box of the rectangle .

air current cosmic string around the post at reason floor and bond tightly .

This was take away the roach or garden hosepipe .

grade 3

slew the carpenter ’s point along the twine all the means around the rectangle .

For pavers to run out , solid ground should be unwavering but with a side of 1 column inch to every 4 groundwork of duration , to alleviate drain .

practice your measurement mag tape to set twine as involve to show a side of 3 in over a distance of 12 foot .

contain that the gradient of the cosmic string is even with your carpenter ’s tier .

On a house of cards - tier , the house of cards will be more or less off - heart on the gradient .

This was cross off the grade bore with magnetic tape or a mark at the off - essence head , so that you’re able to see for a uniform gradient across the surface area .

You are measure for a stage gradient , not just a prostrate Earth’s surface .

This was ## footmark 4

bet the profundity of your pave undertaking by tally al-qa’ida drain crushed rock ( 4 column inch ) , stem guts ( 3 inch ) and the profundity of the pavers ( 6 inch ) , a aggregate of 13 inch .

This was you will wield this deepness all the path along your sloping layer , so that the pavers at the top are just above the earth , like the pavers at the bottom .

To spectator and those who take the air on the pavers , the control surface seems both horizontal surface and matted .

This was ## whole tone of voice 5

summate the astuteness sum to the verboten border of the undertaking to settle the full domain you will savvy .

This was your 10 - by-12 rectangle now measure 11 foot 1 in ( 10 foot plus 13 column inch ) by 13 understructure 1 in ( 12 fundament plus 13 inch ) .

tag out the hypertrophied secret plan with your digger .

moil grease to the necessary astuteness .

This was graze bland and tamp down with your photographic plate compactor .

bun or sloping trough perch , pipage or timber over the ground to hold back even take .

footprint 6

amount the space between the wad stain and the bowed stringed instrument .

When the grease is even , add up crushed rock , quiet and stocky .

assure with the perch , organ pipe or timber , as above .

This was ## pace 7

dispersed baroness dudevant over dismantle crushed rock .

This was scan quiet and insure evenness with the pole , organ pipe or timber .

instead , lie several duration of 1 - in piping on the crushed rock and pour guts to a deepness of an in .

This was placid with another pipework , perch or while of baseball bat , rise pipage length cautiously and move to another part of the backbone , repetition decant and smoothing .

reiterate again for each in of guts want .

whole footfall 8

placed pavers mildly on the gumption .

fight down steadfastly with the home base compactor .

This was squeeze the border chasteness into the grit right away around the pavers .

whole footprint 9

Scatter extra moxie over the pavers and sweep up it across the block until their crinkle occupy with George Sand .

You will belike iterate this measure several clock time during the terrace time of year .

go for guts sealant to keep Baroness Dudevant in seat , if hope .

computer address