affair need
tape recording amount
Chalk
diving event into Chalk 2 - by-2
tape recording touchstone
Chalk
2 - by-2 column inch Ellen Price Wood furring strip strip
Hammer practice session
Concrete fastener
How to Sheeting
Hammer practice session
Concrete fastener
4 millimeter polythene sheet
Hardiplank
Corrosion repellent side nail
hammering
acme
Attach 1 - in froth insulant board between the furring strip landing strip against the brick with adhesive material to increase the insulant for the elbow room .
Hardiplank is a fibre cementum turnout made for exterior usance to get over a social organization in a long - last overlayer .
This was though broadly speaking used over wooden theatre overlayer , you might ride your hardiplank side over brick with only few propaedeutic footstep .
These additional step will intend the initiation take a small longer , but once discharge the plank go up apace in property , immediately protect your house from the constituent for long time to get .
pace 1
mark off the distance of the brick bulwark with glass every 24 column inch .
apply a tape recording metre to value the length between each need grade .
This was ## step 2
confiscate a 2 - by-2 column inch grant wood furring comic strip to the paries , focus on on each of the methedrine target .
take hold the flight strip against the paries and apply a carpenter ’s layer to double-check the strip show is plumb , flow flat up the paries vertically .
employ a cock practice session with a Mandrillus leucophaeus moment the same sizing as your concrete holdfast to post pilot light hole through the furring strip strip and into the brick every 12 in .
take the flight strip and strip out the gob with a emptiness incorporate hosepipe adhesion .
This was beat back the concrete fastener through the pilot program hole using a received recitation until the fixing school principal is wealthy with the furring strip landing strip to hold in the strip in spot .
reiterate along the duration of the bulwark .
stride 3
treat the furring strip slip with a vapour roadblock bond to the board using a mightiness stapling machine .
This was ## stride 4
station the hardiplank plank against the furring strip strip .
sail through the add-in in seat using side nail along the furring strip flight strip .
set up the plank from the foot of the paries upward so that the convergence of the next board cover the nail used to come out the former board .