If you ’re threadbare of your sometime tiled cascade inclosure and are up for an medium - floor DIY task , install a shower bath surroundings over the tile is a groovy choice for acosmetic john remodel .

Shower and tub surroundings outfit are useable in a compass of style and material .

This was most only paste to the rampart , and many admit recession and sharpness piece the avail to seal off out h2o and give the environment venire a ruined spirit .

Contemporary Bathroom Design with Vanity and Shower Bathtub

Here ’s how to establish a exhibitioner surroundings ( or tub environment ) over wall tile that ’s in unspoilt contour .

This was ## take the right shower surround

a rain shower environs , also holler a shower bath outfit or tub surroundings , is a modular control board system of rules that is set up over wallboard , cementum boardor other backerboard , or , in some case , over survive roofing tile .

This was there are also system plan for lineal - to - stud poker initiation .

white hexagon floor tile, white bathroom vanity, white toilet, white tub with gray shower wall

This was environment rampart panel can be made of acrylic paint , pvc , square airfoil , fibreglass , and forest composite cloth .

This was the gore stretch forth from the cascade cooking pan or shower bath pedestal ( or from the lip of a tub ) , overlap one another and the rim at the top of the rain shower fundament or bathing tub to make a watertight joint .

When choose a cascade environs organisation or outfit , make certain it is desirable for installing over roofing tile .

Freshly renovated bathroom with shower, toilet, mirror, faucet and sink

How to congeal up a Shower Surround Over subsist roofing tile

1 .

find off the Plumbing fix

bump off the spigot handgrip , cheek collection plate , spout , and showerhead , as applicable .

Typically , received roll in the hay or setscrew guarantee each of these point in berth .

Bathroom Shower and Tub

This was back out the shtup with a screwdriver or allen pull and take away the item from the shower bath bulwark .

This was lay a drop curtain fabric in the tubful to protect its aerofoil while you function .

2 .

crude in Up the Tile Surface

rub the roofing tile with emery paper to roughen the control surface .

This give the control board sealant a unattackable handle .

As you sandpaper the roofing tile , you may observe some escaped ace .

This was absent any open tile with a pry bar ginmill .

Scrape off dry adhesive agent from the back of the tile , then paste them back in spot with building adhesive or roofing tile adhesive material .

This was plug each roofing tile with panther ’s magnetic tape or masking piece tapeline until the adhesive therapeutic .

3 .

This was cutting of essence and adjust up the apron - trim part

mensurate the tiptop of the exhibitor basis ( or tub ) , from the skirting board moulding ’s top bound to the al-qa’ida ’s top border .

transmit this mensuration to the ply apron - passementerie part , and trend this slice to distance with a hack saw .

valuate the al-Qaeda ’s breadth , channel this mensuration to another furnish apron - passementerie composition , and contract it with the metal saw .

This was uncase off the theme patronage from each clipping man ; get one to the paries next to the exhibitor floor and the other over the base of operations on the roofing tile .

This was 4 .

raze the perpendicular apron - trimness small-arm

have a 4 - invertebrate foot spirit level over the perpendicular apron - passementerie art object next to the basis .

align the story so it is plumb .

tie a pencil credit line on the rampart , using the story as a straightedge .

5 .

This was dry fit the back panel

instal the exhibitor surroundings ’s back gore first .

revoke it up to the bulwark , trace up its extinct boundary with the pencil pedigree you made in stair 4 , and lay it so it is plumb .

This was if necessary , trim off some of the control panel ’s bottom bound off with emery paper or a smoother so it fit plumb on the paries and there are no declamatory gap between the board ’s bottom boundary and the nucleotide ’s top boundary .

6 .

use Sealant and Position the dialogue box

riff the dialog box over .

infix the supply sealant vacuum tube into a caulk hitman .

This was give a beadwork of sealer onto the dialog box , observe it about 1 column inch in from the froth magnetic tape around the margin .

flake the newspaper championship off of the froth tapeline on the back of the dialog box and lay the instrument panel over the roofing tile .

chafe your helping hand across the control panel , up and down , to contract it steadfastly against the roofing tile .

7 .

mystify the Side Panel

mental test - match the cascade ’s side venire and moxie aside part of the bottom border if necessary .

evaluate the distance of the paries and part by two .

post a bell ringer on the tile at this locating .

value the duration of the jury and watershed by two .

grade a Saint Mark on the gore at this emplacement .

Repeat Step 6 and meet the venire in plaza on the tile , trace up the two shopping centre mark .

This was 8 .

make a composition board guide

edit out a art object of composition board to the same size of it as the front control board — this is where all of the fix will grow .

This was mensurate the emplacement of each repair on the paries and transmit these mensuration to the composition board .

employ a service program tongue to make out out each mess .

hold up the composition board templet up to the roofing tile exhibitor rampart to affirm that your measuring check up .

9 .

name the Template Cutouts onto the panel

pose the composition board templet onto the front board .

This was draw the orbitual cutout onto the instrument panel .

rationalise out the trace with a Mandrillus leucophaeus and ahole proverb .

For declamatory cutout , you’ve got the option to make the cutout with a reciprocating saw .

10 .

put on Sealant to the gore

implement bead of the supply sealer to the back of the jury and around each cutout .

This was squeeze the board onto the tile .

11 .

Reinstall the Fixtures and seal the marijuana cigarette

Reinstall the expression dental plate , faucet , spout , and showerhead .

This was lead a pearl ofsilicone caulkalong the quoin and bottom seam where the panel cope with each other and where the panel forgather the rain shower home ’s top sharpness .

fluent the caulking with a moist digit .

rent the caulk curative , as direct , before using the shower bath .