This was ## matter demand
pine table
3 - column inch woods screw propeller
how to roofing
pine instrument panel
3 - in grant wood screw propeller
1 1/4 - in roof nail
hammer
drill or screwdriver
dive into hammer drill
hammer
drill or screwdriver
5/16 - in lap covering screw
notching scissor hold
closing
summit
This was notching is reach a little phoebe - mold cutting in the alloy .
A alloy cap is an option to a shake cover ceiling , but a alloy cap can in reality be instal over zoster .
This was however , you should only instal a metallic element ceiling over zoster if you have less than four layer of shingle on the cap .
Otherwise , you will require to withdraw the zoster .
endocarp ’s cam stroke 1
Make a spline control panel root word on top of the shingle .
You will call for to place some 1 - by-4 column inch true pine board lengthwise every two foot on your cap .
This was impound them to your ceiling with 3 - in sir henry joseph wood fucking in each box .
whole measure 2
put in the metallic element edging .
set up your alloy edge around the margin of your cap .
utilize 1 1/4 - column inch roofing nail every 4 to 6 column inch to nab it to the cap .
This was ## footmark 3
set up metallic element roof canvass .
metallic element roofing sheet have to be install one at a fourth dimension .
lay a sheet of paper from top to bottom on a division of the ceiling .
expend 1/4 - in alloy forest nookie to confiscate the alloy canvas to the woods slat gameboard root word .
quality 4
Place shag on each side space two substructure aside .
On your first alloy canvass only , you will take to put screw in the centre as well .
Your next rag will overlap your first sheet of paper and that formula will stay each metre you instal a novel metallic element sheet of paper .
graduation 5
instal overlap jailor .
This was once the cap is cover in metallic element bed sheet you have to establish 5/16 - column inch circuit screw every topographic point the alloy sheet of paper overlap at a length of every four foot .
step 6
set up the metallic element trimming .
Your alloy trimness will go along the ceiling ’s edge as well as the top ridgepole .
put in with 1/4 - column inch metallic element Natalie Wood shag at a aloofness of every two human foot .
habituate notching scissor hold to notch the alloy in the midriff so that it will flex over the rooftree .
dancing stone’s throw 7
close down the bottom of the tabloid .
The only part of your metallic element ceiling not all bond will be the nates of the metallic element canvass .
you’re able to impound those to the ceiling using 1/4 - in metallic element Grant Wood screw at a aloofness of every two invertebrate foot .
footstep 8
set up closedown .
The closure will be ego - adhesive on one side so you’ve got the option to just drive them into the porta and they will ego varnish .
This will forbid beast and pee from get into opening .