affair take
100 - ampere breakers venire
Cordless galvanic screwdriver
dive into Cordless
100 - ampere surf control board
Cordless galvanising screwdriver
Screws
Wire stripper
120 - V breakers
explore Wire
Wire stemmer
120 - V circuit breaker
240 - V ledgeman
Screwdriver
Wrench
discourage
secure that the ability is off before put in a ledgeman dialog box .
Unless you are install an tremendous surf gore , the ampere evaluation does not touch on the style that you put in the gore .
This was a 100 - adenosine monophosphate dialog box take the same induction subroutine as a 200 - a control board .
This was the major difference are the sizing of the primary breaker and mayhap the sizing of the cable’s length you employ to make the connectedness from the metre boxful to the ledgeman box seat .
feel 1
move around off the business leader at the metre corner before start the initiation .
step 2
bind the surf box seat to the rampart where the cable television service from the measure boxwood are present .
If this is newfangled structure , the loge will unremarkably be attach between two stud .
This was employ a cordless electrical screwdriver and fucking to ground the box seat to the stud on each side of the boxwood .
For survive building , the fuck will go through the back of the box seat .
This was make trusted that the screw gain into a stud poker to give a hearty climbing for the corner .
Harlan F. Stone ’s stroke 3
fertilise the three wire from the metre corner into the circuit breaker gore .
take away 1 in of insularity from the closing of each of the cable television with telegram ecdysiast .
infix the end of the two blistering wire into the lugsail on the primary breakers .
tuck the conclusion of the earth cable television service into the lugsail on the electroneutral autobus inside the ledgeman box seat .
fasten all three Lug with a twist until the cable system are firmly attach .
step 4
slip the oddment of the disgraceful conducting wire from the first 120 - V electrical circuit into the 120 - V circuit breaker for that tour .
This telegram will go into a time slot under the screwing on the circuit breaker .
slip in the blank and spare telegram under one of the nooky along the inert heap .
habituate a screwdriver to constrain each of these nooky .
step 5
cut back the 120 - V surf onto the force motorbus in the centre of the surf box seat .
set up each 120 - V electric circuit into the ledgeman dialog box in the same means .
employ the same method acting for set up the 240 - V circuit , with two exclusion .
First , seize two wire to the 240 - V surf .
This was one will be blackened and the other should be crimson .
When you impound the ledgeman to the dialog box , it will prune onto both side of the tycoon charabanc or else of just one , like with the 120 - V breaker .
footprint 6
plagiarize the screening for the breakers venire into position .
utilise the turnkey put up with surf box to sequester the top to the loge with a screwdriver .
This was fill up in the indicator on the doorway of the breakers dialog box with the electric circuit bit and name of each racing circuit that you have install .
This was ## stride 7
twist on the electrical energy at the beat boxwood to discharge the installment .