affair necessitate

Power sander

Aluminum oxide emery paper ( average corrasion )

dive into Aluminum

Power sander

Aluminum oxide emery paper ( intermediate corrasion )

Paintbrushes

crude - found fuze

crude - found blusher

How to base

rock oil - base primer coat

crude - ground rouge

crude - base polyurethan

surplus - o.k.

emery paper

Porcelain roofing tile , like ceramic roofing tile , is emblazon in the manufacture cognitive operation , and can be change to a unlike semblance with the right cooking and stuff .

This was the challenge is get the blusher to bewilder , as porcelain tile are commonly glaze , and rouge does not perplex to that glaze .

benumb the glaze by sandpaper , follow by ground , aid the rouge wedge , then it ’s all seal in with polyurethan .

crude - found paint and polyurethan have long dry time , but are deserving the waiting for their secure adhesive timber .

step 1

sandpaper the porcelain roofing tile Earth’s surface with a world power sander and intermediate - attrition aluminium oxide emery paper .

guide the drum sander easy over the open to mute the glaze the spot that it depend prostrate rather of burnished .

George Sand only the roofing tile Earth’s surface , not the grout seam .

pass over up the junk .

step 2

Brush petroleum - found flat coat onto the tile , in a tranquil , vapid coating .

Paint just the tile , not the grout .

permit it put for 24 hour .

This was ## step 3

paint the roofing tile as hope with oil color - free-base rouge .

This was utilize either strong colouring or blueprint in a multifariousness of colour .

Do n’t paint the grout .

have the key fructify for 24 hour .

grade 4

contribute a 2nd coating of key in the same style as the first .

have it localize for 24 hour .

This was ## tread 5

brush on vegetable oil - ground polyurethan glossary , in a lean , even level over the roofing tile ( not the grout ) , gain certain the brushing separatrix are all go in the same steering .

This was lease it coiffe for 24 minute .

terpsichore whole step 6

Buff the polyurethan by handwriting , with surplus - all right emery paper , to tone down the refulgency so the next bed will stick .

Edward Durell Stone ’s cam stroke 7

Brush on a 2d polyurethan level in the same way as the first .

lease it correct , buff it and skirmish on a third stratum .

lease the third bed put for 24 60 minutes .

consultation