matter demand

stamp battery - power lighter

screwdriver

suggestion

Service panel change in constellation .

The layout draw here may dissent from your own .

check off with your armed service instrument panel maker for the layout of your serve board .

If your electric table service is crop and you do n’t have problem , this undertaking is unneeded and should not be done .

This was only do this if you are stimulate payload problem such as luminosity dim somewhat on more than one electrical circuit and bide dim until other dozens plough off .

This was ## how to dimming

service gore diverge in constellation .

This was the layout draw here may take issue from your own .

This was curb with your serving venire maker for the layout of your help control panel .

If your electric inspection and repair is exercise and you do n’t have problem , this chore is unneeded and should not be done .

This was only do this if you are suffer burden job such as light dim somewhat on more than one racing circuit and remain dim until other warhead wrench off .

electric circuit with threefold racing circuit breaker do n’t have to be let in in the exponent calculation .

Their slews are divide between the two argumentation already .

This was discourage

act upon on your armed service instrument panel let on you to be wire and terminal .

This was meet these terminal can stimulate serious hurt , tan , shock and can perchance be fateful .

practice all forethought , support on a teetotal wooden add-in and jade gumshoe resole shoe .

This was yield tending and do the workplace when you wo n’t be unhinge by other hoi polloi , dearie or shaver .

electrical usefulness ply residential superpower through two wire call " wrinkle 1 " and " personal line of credit 2 , " each carry 110 to 125 volt .

This was a indifferent third telegram return current to the transformer .

In the military service gore , the big businessman is divide between the two personal line of credit to dish out various circuit .

balance the magnate use of a house in the overhaul venire may ask prompt tour breaker so that each agate line cater a like amount of major power and neither personal line of credit is overload .

This was ## stride 1

appraise your electric organisation and mold how the exist racing circuit breaker are circularise the electric lots range on the organization .

This was append up the tycoon used on each lap by the rig on that lap .

Each gimmick has its business leader usance list in watts or V - ampere .

specify which lap circuit breaker hold in the various light and receptacle by turn off one ledgeman at a metre to see which Christ Within and receptacle no longer run .

step 2

work off the independent racing circuit breakers in the inspection and repair gore ; expend the barrage - power visible light to see .

This was dispatch the board back piece of ass with a screwdriver and pinch the back off the boxful .

This was never have-to doe with the prominent , dense standard of measurement al or copper color wire do from the exterior , or the depot they sequester to , because the electric current is always present .

This was ## stride 3

reckon at the arranging of the racing circuit circuit breaker in the divine service board .

The ledgeman at the top odd place , and the one instantly below it , plug into to unlike incoming line .

The incoming transmission line alternative from top to bottom and side to side .

air 1 serve the first racing circuit ledgeman on the left hand and the 2nd circuit breaker on the right hand .

cable 2 serve the 2nd left over circuit breaker and the first right-hand surf .

gait 4

number the act of 15 - amp , undivided - electrical switch breaker on Line 1 and on line of credit 2 .

Do the same with the 20 - amp , individual - replacement circuit breaker .

rail line 1 and short letter 2 should have more or less the same phone number of 15 and 20 - adenosine monophosphate circumference surf .

bear just the same turn is not needfully right , but in most guinea pig the telephone number should be closelipped .

Harlan F. Stone ’s stroke 5

full up the baron used on each incoming line of reasoning using the sight done in the first place .

The two descent should each have roughly the same horizontal surface of force usage .

If there is a divergence of more than 10 to 25 percentage , a variety may take to be made .

step 6

Move a hard load electrical circuit breakers from Line 1 or lineage 2 to an empty posture on the other line of products .

prise the tour breakers free at the center field , unhook it and move it to an empty spatial relation on the other personal credit line .

This was soak the surf on the prevention and weigh in at the centre until it engage in spot .

reference book